Garage Conversion ADU

The fastest, most cost-effective path to a permitted ADU — your existing garage becomes a full unit.

350–800 sq ft
Typical size
4–6 months
On-site build
$85K
Starting at
Inspections + handoff
Closeout
What we build

Garage Conversion ADU across Los Angeles, Orange & Ventura Counties.

A garage conversion is the fastest and cheapest way to add a permitted, rentable ADU in LA. We reuse the existing foundation, walls, and roof — meaning fewer permits, less engineering, and construction that finishes in 4–6 months on site.

HomeAdd converts 2-car and 3-car garages into studios, 1-bedrooms, and 2-bedroom ADUs. Every conversion includes new insulation, drywall, plumbing, kitchen, bath, HVAC, flooring, and a proper exterior door. Fully code-compliant and fully rentable.

Under California ADU law, cities cannot require replacement parking when you convert a garage into an ADU. Your garage becomes livable square footage without giving up anything the city can hold against you.

Options

Ways homeowners use this addition.

2-car garage studio

The classic — 400 sq ft open-plan studio with full kitchen and bath.

2-car garage 1-bedroom

Separated bedroom, full bath, kitchen, living — the rental sweet spot at 400–450 sq ft.

3-car garage 1-bedroom

Larger footprint (600–700 sq ft) allows a real living room and separate bedroom.

3-car garage 2-bedroom

Family-scale ADU up to 800 sq ft — commands premium rent.

Partial garage conversion

Convert one bay to a JADU or office and keep the other bay as parking.

Garage conversion + expansion

Convert plus a small addition off the back of the garage — pushes the unit up to 1,000+ sq ft.

All-in scope

What's included in every HomeAdd project.

Foundation & wall assessment
Confirm the existing structure is suitable — if not, we recommend a rebuild.
Architectural design
Floor plan, window/door additions, kitchen and bath layout.
Structural engineering (as needed)
Header engineering for new windows and doors, seismic upgrades where required.
Title 24 & MEP design
Energy compliance, HVAC, and full MEP design.
Local ADU permits
California's 60-day ADU review clock applies. We file and manage.
Foundation upgrades
Slab leveling, moisture barrier, and any required footing work.
Insulation
Full wall and ceiling insulation to meet code — critical for a warm, quiet ADU.
New windows & doors
Egress windows for bedrooms, upgraded exterior door, garage door removed and framed in.
Full kitchen & bath
Cabinetry, counters, appliances, tile, fixtures.
HVAC (mini-split)
Efficient ductless system sized for the ADU.
Interior finishes
Drywall, flooring, paint, trim, doors, hardware.
Detailed construction proposal
Defined scope with itemized allowances after design. Written change-order process. Warranty terms are documented in the signed contract.
Timeline

A realistic schedule, phase by phase.

  1. 1
    Feasibility & design
    3–4 weeks

    Site walk, structural assessment, design.

  2. 2
    Permit set
    3–4 weeks

    Engineering (where needed), Title 24, drawings.

  3. 3
    Plan check & permits
    5–8 weeks

    Plan-check submittal, corrections, and permit issuance.

  4. 4
    Demo & foundation prep
    1–2 weeks

    Remove garage door, level slab, moisture barrier, footings for new walls.

  5. 5
    Framing & envelope
    2–3 weeks

    New windows/doors framed, exterior finishes updated.

  6. 6
    MEP & insulation
    2–3 weeks

    Rough electrical, plumbing, HVAC, insulation, drywall.

  7. 7
    Kitchen, bath, finishes
    3–4 weeks

    Cabinetry, tile, flooring, paint, fixtures, appliances.

  8. 8
    Final inspection & handoff
    1 week

    Building final, address assignment, punch list, warranty.

Investment

What it costs in LA, Orange & Ventura Counties.

Preliminary planning ranges vary by jurisdiction, site conditions, design, utilities, and finish level. A written proposal follows feasibility and design.

2-car garage studio
starting at $85K

Open-plan 400 sq ft studio with full kitchen and bath, standard finishes.

2-car garage 1-bedroom
starting at $120K

Separated bedroom, mid-range finishes, dedicated mini-split.

3-car garage 1 or 2-bedroom
starting at $160K

Larger footprint (600–800 sq ft) with upgraded finishes.

Permits & code

Filed, corrected, inspected — by us.

We submit to LADBS, LA County DPW, and every OC and Ventura jurisdiction weekly. You never touch a portal, sit on hold, or drive to a counter.

  • ADU permit (California's 60-day review timeline)
  • Structural plan check (as needed)
  • Title 24 energy compliance
  • Plumbing, electrical, mechanical permits
  • Foundation / slab work permit
  • Egress window compliance
  • Address assignment
  • Final building inspection & CofO
Reference imagery

What this scope typically looks like.

Representative planning images of the kind of build described above.

Garage conversion ADU interior
Garage conversion framing
Alternative detached ADU option
Above-garage ADU option
Interior finish detail
FAQ

Answers we give on most first calls.

Still have questions? Call (877) 544-1543 or request a callback — a HomeAdd project advisor will walk your address on Google Earth with you on the phone.

Is a garage conversion really the cheapest ADU option?+

Usually yes — you're reusing the foundation, walls, and roof, which are the most expensive parts of new construction. Expect to save $75K–$150K vs a comparable detached ADU.

Will I have to replace my parking?+

No. Under California ADU law, cities cannot require replacement parking when you convert a garage. Even in areas that traditionally require covered parking, the state override applies.

How much rent for a garage-conversion ADU?+

In the SFV, garage-conversion studios rent $2,200–$2,900/month; 1-bedrooms $2,600–$3,600. Close to detached ADU rents at a fraction of the build cost.

What if my slab is cracked or too low?+

We assess in feasibility. Minor cracks are patched and moisture-barriered. If the slab is below code height or badly damaged, we quote a partial or full slab replacement as a line item.

Can I keep the garage door look?+

Yes — we can preserve the garage-door opening as a large window wall or fixed panel. Some clients love the industrial look; others prefer full stucco infill.

How does this compare to an above-garage ADU?+

Garage conversion is cheaper, faster, and simpler. Above-garage ADU is more expensive but preserves parking and often earns higher rent due to privacy. We help you weigh both in feasibility.

Ready to plan your garage conversion adu?

We'll walk your property, pull the zoning, and give you a real budget and timeline — before you spend a dollar on design.