ADU construction in Los Angeles
Our process · Design-build, one contract

From backyard idea to finished home.

Design-build, one contract, one team. No handoffs between architect, engineer, expeditor, and contractor — that's where projects fall apart.

Free
Feasibility & zoning
Written
Proposal after design
1 PM
Dedicated per project
Closeout
Inspections + handoff
The 7 steps

Transparent, predictable, and boring in the best way.

You'll always know which step you're on, what happens next, and who to call. Below is the exact sequence we run on every ADU, garage conversion, and addition.

  1. Feasibility & zoning check — HomeAdd 01
    Step 01
    Week 0 · Free

    Feasibility & zoning check

    We pull your parcel, check LA / OC / Ventura zoning, setbacks, FAR, utility easements, and fire zones. You leave the call knowing exactly what's buildable — square footage, height, and unit type — before you spend a dollar.

    Zoning summaryBuildable envelopePreliminary budget range
  2. On-site walkthrough & scope — HomeAdd 02
    Step 02
    Week 1

    On-site walkthrough & scope

    A senior estimator and designer meet you at the property. We measure, photograph, locate the panel and sewer line, and align on program, finishes, and timeline. This is where a real number replaces a Google estimate.

    Existing conditions notesProgram briefRefined budget
  3. Design & written proposal — HomeAdd 03
    Step 03
    Weeks 2–4

    Design & written proposal

    Concept plans, 3D renderings, and material selections. You approve a layout you can actually picture living in — then we issue a detailed construction proposal with defined scope and itemized allowances, not a placeholder allowance sheet.

    Floor plans3D renderingsDetailed construction proposal
  4. Construction documents & engineering — HomeAdd 04
    Step 04
    Weeks 4–8

    Construction documents & engineering

    Structural engineering, Title 24 energy, MEP (mechanical/electrical/plumbing), and every sheet your building department requires. Nothing gets to plan check half-drawn.

    Full CD setStructural calcsTitle 24 report
  5. Permits & plan check — HomeAdd 05
    Step 05
    Weeks 8–16

    Permits & plan check

    We submit to LADBS, LA County, or your local OC / Ventura department, respond to every correction, and pull the permit. You never chase a planner — we do.

    Permit submittalCorrection responsesApproved permit
  6. Construction — HomeAdd 06
    Step 06
    Months 4–8

    Construction

    One dedicated project manager, one crew lead, one weekly update. A live schedule you can open on your phone, a clean site, and inspectors coordinated on our end.

    Weekly progress reportsLive scheduleInspection coordination
  7. Final inspection & handoff — HomeAdd 07
    Step 07
    Final week

    Final inspection & handoff

    Punch list walked with you, final city sign-off, Certificate of Occupancy, closeout documentation, and appliance manuals. Any post-completion check-ins and warranty terms are documented in the signed contract.

    City sign-offCloseout documentationAs-built package
Inside the build

What each phase looks like.

Reference imagery of the design, walkthrough, framing, and handoff phases described above.

Design & renderings
Design & renderings
On-site walkthrough
On-site walkthrough
Framing & construction
Framing & construction
Final walkthrough
Final walkthrough
We handle
  • Zoning research and feasibility
  • Architectural design & 3D renderings
  • Structural, Title 24, MEP engineering
  • Plan-check submittal & corrections
  • Permit pull & inspection scheduling
  • Demolition, foundation, framing, MEP, finish
  • Utility upgrades and separate meters
  • Final sign-off & Certificate of Occupancy
You handle
  • Approving the design at each milestone
  • Selecting finishes from our curated options
  • Signing change orders (if any)
  • Making progress payments per schedule

That's it. You'll never chase a planner, coordinate an inspector, or wait on hold with DWP. That's our job.

Process FAQ

Questions we hear on every first call.

How long does an ADU actually take in Los Angeles?+

For a detached ADU in LA, plan on 3–5 months of design and permitting followed by 4–7 months of construction. Garage conversions and JADUs move faster — often 6–8 months total.

Do you handle permits, or do I?+

We handle every permit. Zoning verification, plan-check submittal, corrections, and inspection scheduling with LADBS, LA County, Ventura County, or any OC city — all included in one contract.

Is the price actually fixed?+

After construction documents, you receive a detailed written construction proposal with a defined scope and itemized allowances. Any changes to scope or price are handled through a written change-order process that you approve before work proceeds.

Can I live in my house during construction?+

For detached ADUs and most garage conversions, yes — we stage work so your home stays livable. Large additions or interior conversions sometimes need a short displacement; we tell you up front, not mid-project.

Which cities do you build in?+

Woodland Hills and the San Fernando Valley are home base. We regularly build across LA (Westside, Palisades, Santa Monica, Pasadena), Ventura County (Thousand Oaks, Simi, Camarillo), and Orange County (Irvine, Newport, Costa Mesa).

Start at step 01

Free feasibility & zoning check for your address.

Tell us your address and what you're imagining. We'll come back with a buildable envelope, a rough budget, and honest answers — no pressure, no obligation.