ADU construction in Los Angeles
Our process · Design-build, one contract

From backyard idea to finished home.

Design-build, one contract, one team. No handoffs between architect, engineer, expeditor, and contractor — that's where projects fall apart.

Free
Feasibility & zoning
Written
Proposal after design
1 PM
Dedicated per project
Closeout
Inspections + handoff
The 7 steps

Transparent, predictable, and boring in the best way.

You'll always know which step you're on, what happens next, and who to call. Below is the exact sequence we run on every ADU, garage conversion, and addition.

  1. Feasibility & zoning check — illustrative image
    Step 01
    Free

    Feasibility & zoning check

    We pull your parcel, check the zoning that applies in your city or county, setbacks, FAR, utility easements, and fire zones. You leave the call knowing exactly what's buildable — square footage, height, and unit type — before you spend a dollar.

    Zoning summaryBuildable envelopePreliminary budget range
  2. On-site walkthrough & scope — illustrative image
    Step 02

    On-site walkthrough & scope

    A senior estimator and designer meet you at the property. We measure, photograph, locate the panel and sewer line, and align on program, finishes, and timeline. This is where a real number replaces a Google estimate.

    Existing conditions notesProgram briefRefined budget
  3. Design & written proposal — illustrative image
    Step 03

    Design & written proposal

    Concept plans, 3D renderings, and material selections. You approve a layout you can actually picture living in — then we issue a detailed construction proposal with defined scope and itemized allowances, not a placeholder allowance sheet.

    Floor plans3D renderingsDetailed construction proposal
  4. Construction documents & engineering — illustrative image
    Step 04

    Construction documents & engineering

    Structural engineering, Title 24 energy, MEP (mechanical/electrical/plumbing), and every sheet your building department requires. Nothing gets to plan check half-drawn.

    Full CD setStructural calcsTitle 24 report
  5. Permits & plan check — illustrative image
    Step 05

    Permits & plan check

    We submit to LADBS, LA County, Ventura County or your city's building department, respond to every correction, and pull the permit. You never chase a planner — we do.

    Permit submittalCorrection responsesApproved permit
  6. Construction — illustrative image
    Step 06

    Construction

    One dedicated project manager, regular progress updates, a shared schedule, and inspections coordinated on our end.

    Progress updatesShared scheduleInspection coordination
  7. Final inspection & handoff — illustrative image
    Step 07

    Final inspection & handoff

    Punch list walked with you, final city sign-off, Certificate of Occupancy, closeout documentation, and appliance manuals. Any post-completion check-ins and warranty terms are documented in the signed contract.

    City sign-offCloseout documentationAs-built package
Inside the build

What each phase looks like.

Reference imagery of the design, walkthrough, framing, and handoff phases described above.

Design & renderings
Design & renderings
On-site walkthrough
On-site walkthrough
Framing & construction
Framing & construction
Final walkthrough
Final walkthrough
We handle
  • ✓ Zoning research and feasibility
  • ✓ Architectural design & 3D renderings
  • ✓ Structural, Title 24, MEP engineering
  • ✓ Plan-check submittal & corrections
  • ✓ Permit pull & inspection scheduling
  • ✓ Demolition, foundation, framing, MEP, finish
  • ✓ Utility upgrades and separate meters
  • ✓ Final sign-off & Certificate of Occupancy
You handle
  • ✓ Approving the design at each milestone
  • ✓ Selecting finishes from our curated options
  • ✓ Signing change orders (if any)
  • ✓ Making progress payments per schedule

That's it. You'll never chase a planner, coordinate an inspector, or wait on hold with DWP. That's our job.

Process FAQ

Questions we hear on every first call.

How long does an ADU actually take in Los Angeles?+

Design and permitting typically run several months, and construction runs several months after permits are issued. Garage conversions and JADUs are often shorter. Timelines vary by jurisdiction, plan-check corrections and site conditions, so we give you a schedule tied to your scope with the construction proposal.

Do you handle permits, or do I?+

We handle every permit. Zoning verification, plan-check submittal, corrections, and inspection scheduling with LADBS, LA County, Ventura County RMA or any city building department in Los Angeles and Ventura counties — all included in one contract.

Is the price actually fixed?+

After construction documents, you receive a detailed written construction proposal with a defined scope and itemized allowances. Any changes to scope or price are handled through a written change-order process that you approve before work proceeds.

Can I live in my house during construction?+

For detached ADUs and most garage conversions, yes — we stage work so your home stays livable. Large additions or interior conversions sometimes need a short displacement; we tell you up front, not mid-project.

Which cities do you build in?+

Woodland Hills and the San Fernando Valley are home base. We also build across Los Angeles (Westside, Palisades, Santa Monica, Pasadena, Santa Clarita, Long Beach) and southern Ventura County (Thousand Oaks, Simi Valley, Camarillo, Oxnard, Ventura).

Start at step 01

Free feasibility & zoning check for your address.

Tell us your address and what you're imagining. We'll come back with a buildable envelope, a rough budget, and honest answers — no pressure, no obligation.

CallFree property check