Skip to content
Junior ADU (JADU)
ADUs · JADU

Junior ADU (JADU)

Up to 500 sq ft carved inside your existing home — the simplest permit path and often the fastest to income.

500 sq ft
Maximum size
3–5 months
On-site build
$60K
Starting at
Inspections + handoff
Closeout
What we build

Junior ADU (JADU) across Los Angeles, Orange & Ventura Counties.

A Junior ADU is built within the walls of your existing home — usually a bedroom or garage-adjacent room converted into a private 500-sq-ft unit with its own exterior entrance, efficiency kitchen, and (often) private bath.

JADUs are the fastest permit path in California ADU law: often exempt from impact fees, faster to plan-check, and dramatically cheaper than a detached build. Perfect for aging parents, adult kids, or supplemental rental income.

Typical timeline is 3–5 months on site.

Options

Ways homeowners use this addition.

Bedroom-to-JADU

Convert a spare bedroom + closet + hallway into a JADU with its own entry, efficiency kitchen, and bath access.

JADU with private bath

Includes a full private bath — the higher-end configuration for rental.

JADU with shared bath

Shares a bath with the main house — cheaper, faster, still fully compliant.

In-law suite JADU

Interior-connected JADU with a locking door — perfect for aging parents.

JADU + garage conversion

Combine a JADU inside the house with a full ADU in the garage — max out unit count on one lot.

Studio JADU

Open plan with living, sleeping, and kitchen in one room. Cheapest configuration.

All-in scope

What's included in every HomeAdd project.

Design & feasibility
Room selection, entry location, floor plan.
Efficiency kitchen
Sink, cooktop or two-burner induction, small fridge, cabinets — code-compliant JADU kitchen.
Private exterior entry
Cut and frame a new exterior door (or convert a window) with proper header and weather sealing.
Plumbing (if private bath)
New drain/vent, water supply, and plumbing fixtures.
Electrical
Dedicated circuits for kitchen and bath, GFCI, code lighting.
HVAC
Mini-split or extended zone from main system.
Local JADU permits
JADU permit path — usually faster than a full ADU.
Sound-insulated wall
Sound-dampening on the shared wall between JADU and main house.
Interior finishes
Flooring, paint, trim, doors, hardware.
Detailed construction proposal
Defined scope with itemized allowances after design.
Project closeout
Final inspections, punch list, and applicable warranty documentation per the signed contract.
Timeline

A realistic schedule, phase by phase.

  1. 1
    Design & feasibility
    2–3 weeks

    Room selection, entry location, kitchen layout.

  2. 2
    Permit set
    2–3 weeks

    Drawings, MEP, permit package.

  3. 3
    Plan check & permits
    4–6 weeks

    JADU plan-check submittal — usually fast.

  4. 4
    Demo & wall changes
    1–2 weeks

    Selective demo, new door opening, framing changes.

  5. 5
    MEP rough
    1–2 weeks

    Plumbing, electrical, HVAC rough.

  6. 6
    Drywall & finishes
    2–3 weeks

    Drywall, paint, flooring, cabinetry.

  7. 7
    Kitchen & fixtures install
    1 week

    Efficiency kitchen, plumbing fixtures, appliances.

  8. 8
    Final inspection & handoff
    3–5 days

    Building final, punch list, warranty.

Investment

What it costs in LA, Orange & Ventura Counties.

Preliminary planning ranges vary by jurisdiction, site conditions, design, utilities, and finish level. A written proposal follows feasibility and design.

JADU with shared bath (300–400 sq ft)
starting at $60K

Bedroom or study converted with efficiency kitchen and private entry.

JADU with private bath (400–500 sq ft)
starting at $105K

Full private bath plus efficiency kitchen — the higher-rent config.

JADU + garage ADU combo
starting at $165K

One JADU inside the house plus a garage-conversion ADU on the same permit set.

Permits & code

Filed, corrected, inspected — by us.

We submit to LADBS, LA County DPW, and every OC and Ventura jurisdiction weekly. You never touch a portal, sit on hold, or drive to a counter.

  • JADU permit
  • Building permit for exterior entry
  • Plumbing permit (if private bath / kitchen)
  • Electrical permit
  • Mechanical / ventilation permit
  • Sound insulation compliance
  • Deed restriction filing (state JADU requirement)
  • Final building inspection
Reference imagery

What this scope typically looks like.

Representative planning images of the kind of build described above.

Junior ADU with efficiency kitchen
JADU framing changes
Alternative detached ADU option
Alternative garage conversion
Interior finish detail
FAQ

Answers we give on most first calls.

Still have questions? Call (877) 544-1543 or request a callback — a HomeAdd project advisor will walk your address on Google Earth with you on the phone.

What's the difference between an ADU and a JADU?+

A JADU is built inside the walls of your existing home, capped at 500 sq ft, with an efficiency kitchen. A full ADU is a separate unit (attached or detached) up to 1,200 sq ft with a full kitchen. JADUs are faster, cheaper, and often exempt from impact fees.

Can I have both a JADU and an ADU?+

Yes — California law allows one JADU plus one ADU per single-family lot. It's the fastest way to legally add two rental units.

Does a JADU need its own bathroom?+

No — JADUs can share a bath with the main house. That said, JADUs with a private bath rent for meaningfully more and appraise better.

What's the owner-occupancy rule?+

Under state law, JADUs require owner-occupancy of either the main house or the JADU. This is stricter than the current ADU rule. We record the deed restriction as part of permit issuance.

How much rent can I expect?+

In the SFV, JADUs typically rent $1,600–$2,400/month depending on size and whether the bath is private. Lower than a full ADU but with far lower construction cost.

Do I lose a bedroom count?+

Only in the sense that the room is now the JADU. Many clients convert a rarely-used guest room or downstairs office. Appraisers count the JADU as its own unit, which typically offsets any bedroom count loss.

Ready to plan your junior adu (jadu)?

We'll walk your property, pull the zoning, and give you a real budget and timeline — before you spend a dollar on design.